Retail wholesale warehouse club
opening 60 stores per year.
|
|
Challenge
|
Cut overall project costs and complete construction in 90 days. Stores are 135,000-180,000 sq ft each
|
|
Solution
|
|
Team up with the owner, general contractor, and steel supplier to achieve their goal by:
|
| * |
Setting long term framing package pricing. |
| * |
Setting up flexible shipping arrangements. |
| * |
Adopting standard sets of plans for the lower 48 states. The team developed three footprints with four load variations. |
| * |
Identifying, pricing, and eliminating job site practices that slow down the project schedule. CMC Joist & Deck organized joist packages to speed the erection process. |
| * |
Establishing a single source supplier. |
|
|
Result
|
All items were directly negotiated. The result is a smoother job, lower total job costs, and a schedule that works.
|
|